T-Mobile Aspiria Campus
P1 Building Technologies put their capabilities to work on four newly renovated office buildings at the T-Mobile-Aspiria Campus (formerly Sprint).
Structured Cabling
Installation of a Panduit Structured Cabling with 4,000+ Category 6A data cables and 20,000 ft. of fiber optic cable; 4,000 fiber terminations; 400+ wireless access points
Security
Installation of Access Control system with 400+ doors combined; 250 AXIS IP cameras managed by a American Dynamics video server
Audio/Visual
400+ conference rooms with 55鈥 to 75鈥 monitors; Cisco video conferencing connectivity; room schedulers and occupancy sensors
Quick Facts
-
600,000 + sq. ft. combined office space
-
Video, digital signage, sound systems in common and training areas
-
Large video wall application with control systems to manage their Network Operation Center
Project Details
Overland Park, KS
AL Huber
Need a team of professional specialty contractors to help with your next construction project? Get started by finding a P1 Construction location near you.
Still not sure if 麻豆视频最新最全 is the right fit? Feel free to check out more examples of our past work and hear from our statisfied customers.