Year of Science
麻豆视频最新最全 University College of Arts and Sciences is celebrating a Year of Science!
Image
On February 2, 麻豆视频最新最全 students in the College of Arts and Sciences Learning Community were given a unique opportunity to hear a former United States Ambassador speak on foreign policy issues and U.S.-Russian relations. Steven Pifer, who formerly served as the U.S. Ambassador鈥
KSU students meet with former U.S. Ambassadors
On February 2, 麻豆视频最新最全 students in the College of Arts and Sciences Learning Community were given a unique opportunity to hear a former United States Ambassador speak on foreign policy issues and U.S.-Russian relations. Steven Pifer, who formerly served as the U.S. Ambassador鈥Work in Progress:
Continuing the installation of the temporary duct and assembly of new AHU1 in the East side mechanical room.
Stripped topsoil from addition footprint.
Phoenix air valve replacement in the Annex research labs continues per schedule.
Continue 鈥
2/4- Cunningham Hall Renovation Updates
Work in Progress: Continuing the installation of the temporary duct and assembly of new AHU1 in the East side mechanical room. Stripped topsoil from addition footprint. Phoenix air valve replacement in the Annex research labs continues per schedule. Continue 鈥Work in Progress:
Floor electrical boxes in room 101 & 104 are complete.
Plumbing under slab is complete in 101 & 104.
The sanitary tie-in and under slab rough-in is complete and inspected for the new restrooms in addition.
Electrical raceways have been 鈥
2/4- Smith Hall Renovation Updates
Work in Progress: Floor electrical boxes in room 101 & 104 are complete. Plumbing under slab is complete in 101 & 104. The sanitary tie-in and under slab rough-in is complete and inspected for the new restrooms in addition. Electrical raceways have been 鈥Work in progress:
Air handler assembly of unit 1 continues in 3rd floor mechanical room east with Roth and Air Enterprises.
Abatement coordination and containment underway in the 3rd floor mechanical room west to prepare to demolish AHU #3 serving the vivarium.鈥
1/28- Cunningham Hall Renovation Updates
Work in progress: Air handler assembly of unit 1 continues in 3rd floor mechanical room east with Roth and Air Enterprises. Abatement coordination and containment underway in the 3rd floor mechanical room west to prepare to demolish AHU #3 serving the vivarium.鈥Work in progress:
Demolition of south stairs is complete including the foundations.
Test pile will be tested on 1/29/16.
Steam Condensate receiver in Williams Hall will take place on Saturday with UFM shutdown.
Auger Cast pile installation to begin next week and progress鈥
1/28- Williams & ISB Construction Updates
Work in progress: Demolition of south stairs is complete including the foundations. Test pile will be tested on 1/29/16. Steam Condensate receiver in Williams Hall will take place on Saturday with UFM shutdown. Auger Cast pile installation to begin next week and progress鈥Work in progress:
Electric rough-in is in progress in rooms 101 and 104.
1/28- Smith Hall Renovation Updates
Work in progress: Electric rough-in is in progress in rooms 101 and 104.Image
The Department of Chemistry and Biochemistry will host 鈥淓xplore Kent Chemistry Day鈥, a visitation program for high school juniors and seniors interested in chemistry and biochemistry majors, at 麻豆视频最新最全 on Saturday, February 6 from 10 am to 2 pm in Room 110, Williams Hall on鈥
麻豆视频最新最全 Hosts 鈥淓xplore Kent Chemistry Day鈥 for High School Juniors and Seniors, Feb. 6
The Department of Chemistry and Biochemistry will host 鈥淓xplore Kent Chemistry Day鈥, a visitation program for high school juniors and seniors interested in chemistry and biochemistry majors, at 麻豆视频最新最全 on Saturday, February 6 from 10 am to 2 pm in Room 110, Williams Hall on鈥Current Work Progress:
Currently abating 3rd floor west mechanical room.
Currently coordinating duct tie in from unit 4 to unit 1 & unit 3 tie into unit 2. There will be short supply air outages when sheet metal cross connections occur.
1/25- Cunningham Hall Renovation Updates
Current Work Progress: Currently abating 3rd floor west mechanical room. Currently coordinating duct tie in from unit 4 to unit 1 & unit 3 tie into unit 2. There will be short supply air outages when sheet metal cross connections occur.Anne Jefferson, Ph.D., assistant professor of geology in the College of Arts and Sciences at 麻豆视频最新最全 University, was one of 15 climate change researchers to be named a 2016-17 Public Engagement Fellow of the Leshner Leadership Institute at the American Association for the鈥
麻豆视频最新最全 Geology Professor Named a Public Engagement Fellow of Leshner Leadership Institute at AAAS
Anne Jefferson, Ph.D., assistant professor of geology in the College of Arts and Sciences at 麻豆视频最新最全 University, was one of 15 climate change researchers to be named a 2016-17 Public Engagement Fellow of the Leshner Leadership Institute at the American Association for the鈥Liquid crystal elastomers (LCEs), essentially rubbers with liquid crystal properties, can do a number of fascinating things, especially in the fields of optics, photonics, telecommunications and medicine.